Parkside is about 2.4 km south-east of the Adelaide CBD, and the work here is scoped from what the site actually shows. This page explains the excavation and site clearing process for Parkside, from setting out to the finished job. The ground at Parkside is recorded as reactive clay over the inner-south plain, seasonally reactive, and the terrain as ground that is flat and rises gently toward the parklands edge.

What Parkside is built on

Ground, access and levels at Parkside

Parkside is 2.4 km south-east of the Adelaide CBD and inside the 60 km service area. The ground is recorded as reactive clay over the inner-south plain, seasonally reactive, with ground that is flat and rises gently toward the parklands edge, so what is buried under the surface and where the spoil can go decide how the job is sequenced. The visit covers where the work has to go, how a machine or a delivery reaches it, and what the existing surface is hiding.

How it goes

How a Parkside excavation and site clearing job runs

Every job follows the same sequence, and the sequence is what makes the finished work hold up. Tight-access excavators and tracked loaders sized for suburban blocks, with tip trucks and trailers for spoil removal. Vegetation, old structures, concrete, soil and rubble are stripped and loaded out, then the site is levelled by laser and compacted ready for whatever comes next.

  1. 01

    Site protection goes down where the machine crosses paving or lawn

  2. 02

    The machine walks on and the strip-out begins

  3. 03

    Vegetation, stumps and old structures are cut and stockpiled

  4. 04

    Topsoil is scraped back to expose stable ground beneath

  5. 05

    Spoil is loaded out and counted against the booking

  6. 06

    Levels are checked by laser and the pad is compacted

Common in Parkside

What to expect on a Parkside block

The same handful of problems turn up again and again on this kind of work. Each one changes the scope, and each is priced as its own line rather than buried in a rate.

  1. 01

    An overgrown backyard that has not been usable for years

  2. 02

    Old concrete, pavers and footings buried under the lawn

  3. 03

    Stumps and root mass that have to come out before anything is built

  4. 04

    Spoil with nowhere to go on a tight block

  5. 05

    Levels that fall toward the house instead of away from it

Why AOI

Scope and sequence, not guesswork

Excavation and Site Clearing at Parkside is priced from a written scope that lists what is included before anything is cut, dug or poured. The same team that scopes the work builds it, so the plan that is approved is the plan that gets built.

On price

How the Parkside quote is put together

A written quote follows the site visit at Parkside. It sets out the scope line by line so you can see what is included, and anything found on site that sits outside the scope is quoted and approved before it is touched.

Questions from Parkside

Excavation in Parkside — FAQs

Do you cover Parkside for excavation and site clearing?

Yes, that is our patch. On a Parkside block at 5063, about 2.4 km south-east of the CBD, that is worked out on site, the shape of the site is is flat and rises gently toward the parklands edge, site notes put the ground as reactive clay over the inner-south plain, seasonally reactive.

How is excavation priced?

From the job itself — extent, ground, route in and specification, each broken out. This is Parkside 5063, 2.4 km south-east of the Adelaide CBD, site notes put the ground as reactive clay over the inner-south plain, seasonally reactive.

Can the machine get through a narrow side gate?

It depends on gap and headroom, tight-access plant covering most gates. Parkside sits 2.4 km south-east of the city at postcode 5063, so the detail comes off that block, site notes put the ground as reactive clay over the inner-south plain, seasonally reactive, that is 2.4 km from the Adelaide CBD in postcode 5063.

What cannot go in the loads?

Contaminated material is out of a standard load, while clean fill and demolition waste are accepted. Out this way in Parkside 5063, some 2.4 km south-east of the city, the block decides the detail, ground records list it as reactive clay over the inner-south plain, seasonally reactive.