For a Adelaide address, earthworks and drainage starts with the site rather than the product. Adelaide is roughly 0.01 km north of the city, and what the ground and the access look like there decide the scope before anything is priced. The ground at Adelaide is recorded as ground that moves with the seasons.

How it goes

The build sequence at Adelaide

Every job follows the same sequence, and the sequence is what makes the finished work hold up. Bulk and detailed earthworks, cut and fill, pad preparation and regrading, plus full stormwater solutions: surface falls, ag-drains behind walls and along boundaries, pits, slotted channels and connections to a legal point of discharge.

  1. 01

    Levels are shot across the site and the path of the water is mapped

  2. 02

    Cut and fill reshapes the ground and establishes the falls

  3. 03

    Stormwater trenches are cut falling to the discharge point

  4. 04

    Ag-pipe wrapped in geofabric is bedded in screened aggregate

  5. 05

    Pits and channel drains are set at the low points and connected

  6. 06

    Trenches are backfilled, compacted and the surfaces reinstated

What Adelaide is built on

Before anything is priced in Adelaide

Adelaide is 0.01 km north of the Adelaide CBD and inside the 60 km service area. The ground is recorded as ground that moves with the seasons, so where the water goes is the first question, and the levels are designed around the answer. The scope is written from what is measured and seen on site, not from an assumed rate or a photo.

Why AOI

Scope and sequence, not guesswork

Earthworks and Drainage at Adelaide is priced from a written scope that lists what is included before anything is cut, dug or poured. The same team that scopes the work builds it, so the plan that is approved is the plan that gets built.

Common in Adelaide

What usually needs fixing at Adelaide

The same handful of problems turn up again and again on this kind of work. Each one changes the scope, and each is priced as its own line rather than buried in a rate.

  1. 01

    A yard that holds water every winter

  2. 02

    Downpipes discharging against the footings

  3. 03

    A block graded flat, or toward the house, with nowhere for water to go

  4. 04

    Water sitting behind a retaining wall

  5. 05

    A low point with no pit and no legal discharge

On price

What moves the number

A written quote follows the site visit at Adelaide. It sets out the scope line by line so you can see what is included, and anything found on site that sits outside the scope is quoted and approved before it is touched.

Questions from Adelaide

Earthworks & Drainage in Adelaide — FAQs

Do you cover Adelaide for earthworks and drainage?

Locally the site is Adelaide 5000, about 0.01 km east of the Adelaide CBD, the soil is logged as ground that moves with the seasons. Yes, it is within range and quoted from the measured job.

Why does a backyard flood every winter?

Water arrives faster than it leaves, from sealed ground and a poor fall. The address is in Adelaide 5000, roughly 0.01 km east of the Adelaide CBD, site notes put the ground as ground that moves with the seasons.

What is the difference between stormwater and an ag-drain?

The job here is in Adelaide 5000, 0.01 km east of the centre of Adelaide, local records describe it as ground that moves with the seasons. Sealed pipe from downpipes and pits, slotted pipe in gravel for the ground itself.

What is a legal point of discharge?

Working in Adelaide 5000, some 0.01 km east of the Adelaide CBD, local records describe it as ground that moves with the seasons. The legal exit for collected water, set on the stormwater plan.